Maxxfast-EN
VINYMAXX installation data in solid & hollow substrates
Solid substrates
Hollow substrates*
Type
M8 x 110 M10 x 130 M12 x 160 M12 x 220 M8
M10
M12
D
M8
M10 130
M12 160
M12 220
M8
M10
M12
L
110
-
-
-
Torque in Nm
10 10
12 20 11
14 30 13
14 30 13
10 16
20 16 11
30 22 13
Hole diameter in substrate (d o Hole diameter in fi xture (d f Minimum substrate thickness (h min. ) in mm ) in mm
9
9
) in mm
120
130
160 115
160 115
120/250 90/130
120/250 90/130
120
Minimum hole depth (h o
) in mm
85 20 80 80 40 40
95
90
Maximum fi xture thickness (tfi x max.) in mm
2
34
94
-
-
-
Effective embedment depth (h ef Characteristic spacing (S cr ) in mm
) in mm
90
110 220 110
110 220 110
85/125
85/125
85
160
180
- -
- -
- -
Characteristic Edge distance (tensile) (C cr
,N) in mm
90 45 45
Minimum spacing (S min.
) in mm
55 55 20
55 55 20
100 200
100 200
100 200
Minimum edge distance (tensile) (C min,N. Characteristic load in solid brick in kN (N Rk,S ) Design resistance in solid brick in kN (N Rds ) *Plastic sleeves must be used
) in mm
8,7 2,9
12,1
- -
- -
- -
4
6,7
6,7
VINYMAXX working & curing times in solid & hollow substrates
Resin
Concrete
Working time
Minimum curing time*
Temperature ÂșC
Minutes
5 5 5
-5
70 45 25 15
480 240 120
0 5
10 15 20 25
10 15 20 30
90 60 45
9 5 2
30 *For wet concrete, the curing time must be doubled.
Made with FlippingBook